Saturday, January 3, 2009

Earliest Photos of the MWRR January 03, 2009

The benchwork was completed right before Christmas.  The track plan at this point was still experimental, but the overall concept was pretty well established.  The biggest change from the final track plan is that the crossover in the middle didn't make it, but instead became a one-way reversing loop.